Case study

Queensland Road, Emirates Stadium, Highbury

Download the two-page case study (PDF)

November 2023

The Queensland Road development beside the Emirates Stadium, Highbury

Queensland Road is the final housing phase of the Arsenal Regeneration Area where, in partnership with Arsenal FC and Islington Council, Newton Housing is building more than 1,400 affordable homes, with 1,100 already completed and occupied. Under the Queensland Road contract Kier constructed 354 homes which are a mixture of affordable rent and shared ownership properties. The large number of affordable homes at Queensland Road makes it the biggest single development project in the Arsenal Regeneration Area.

We developed a customised version of the Pandora Heat Bank thermal stores to match the clients requirements, fitted with twin heat exchangers for efficient heat transfer, while also providing 150 litres of stored primary water with electric backup to both hot water and central heating. The development system was initially demonstrated to clients on a monitored test rig to ensure compliance with all requirements, from where WRAS approval was applied for. We have now supplied 354 fully approved systems that are installed and operating as expected. The Heat Banks at Queensland Road connect to a central CHP boiler system, with energy consumption metered and reported by a third party billing system. The Heat Banks were supplied fully pre-fabricated with all the system controls for rapid installation to pipework, and are unique in that they overcome the need for any discharge pipes in properties.

Documents

The Heat Banks supplied for Queensland Road were a slimline version of the Pandora.

Slimline Pandora Heat Bank supplied for Queensland Road

Talk to an engineer

Tell us about your network and we will come back with a practical next step, usually within one working day.