Case study

Balgair Castle, Stirlingshire: flood-proof outdoor HIUs on a biomass network

The holiday park at Balgair Castle was one of the first jobs where we had to install HIUs outdoors. They had to be flood-proof, run at reduced network temperatures and keep return temperatures low at all times.

Download the two-page case study (PDF)

The challenge

The park's lodges and static caravans take their heating and hot water from a biomass heat network. The site covers a large area, so running the network at reduced flow temperatures with low return temperatures keeps pipework heat losses down. The HIUs also had to sit outside each unit and survive flooding.

What we did

We used a variant of our DIGI HIU with a very close-approach, double-pass heat exchanger on the central heating to achieve the low return temperatures. For the outdoor installation we designed a new glass-fibre cabinet, the CAMPER, to house the DIGI and others in the range.

A lodge at Balgair Castle with its green CAMPER HIU cabinet outside

The CAMPER cabinet is split in two. The lower compartment holds the connecting pipework and isolation valves, and lifts the HIU more than 600 mm off the ground to protect it from flooding.

The CAMPER cabinet open, with the HIU above and the connections below

The result

A year after handover the site was running perfectly, with all of its hot water and central heating coming from biomass grown in the surrounding area.

The plant building at Balgair Castle