CP1 Compliance

From Heatweb Wiki
Revision as of 12:42, 21 September 2019 by Rhg (Talk | contribs) (Created page with "This article covers the process of handing over a development fitted with HIUs to CP1 requirements. CP1.1 is now (September 2019) in final draft stage, with no more adjustmen...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

This article covers the process of handing over a development fitted with HIUs to CP1 requirements.

CP1.1 is now (September 2019) in final draft stage, with no more adjustments to be made other than typos. So we are in a position to tackle our first fully CP1.1 compliant heat network, and nail down the requirements, documents and processes involved.

Our goal is to use our IoT connected HIUs to simplify the process, embedding as much of the donkey work as we can into software in order to reduce the labour requirements and remove human error from the scene if possible.

CP1.1 Documents

Some of the documents referred to have not been released just yet.

  • CP1.1 Code of Practice
  • CP1.1 Checklists

However, as the checklist for HIUs is guidance - a minimum standard - we can get to work without hesitation.